Special Topics in Environmental Management

DIY SPPC Plan Amendments


5-Year Review

Owners and operators of regulated facilities must review SPCC plans at least every 5 years. As a result of such review, plans must be amended within 6 months of the review to include more effective prevention and control technology if the technology has been field-proven at the time of the review and will significantly reduce the likelihood of a discharge. Amendments must be implemented as soon as possible, but no later than 6 months following preparation of the amendment.

Completion of the review and evaluation must be documented, and owners and operators must sign a statement as to whether the plan will be amended, either at the beginning or end of the plan or in a log or an appendix to the plan. The following words are sufficient: "I have completed review and evaluation of the SPCC Plan for (name of facility) on (date) and will (will not) amend the Plan as a result."


Simplify SPCC compliance with the NEW TRAC360 platform. In just a few minutes, see how easy it is to create compliant plans and checklists, train your team, and find answers to all your SPCC questions. Learn More


Facility Changes

Plans must also be amended when there is a change in the facility design, construction, operation, or maintenance that materially affects its potential for a discharge. Examples of changes that may require a plan amendment include, but are not limited to:

  • Commissioning or decommissioning containers;
  • Replacement, reconstruction, or movement of container;
  • Reconstruction, replacement, or installation of piping systems;
  • Construction or demolition that might alter secondary containment structures;
  • Changes of product or service; or
  • Revision of standard operation or maintenance procedures at a facility.

An amendment must be prepared within 6 months of the change—and implemented as soon as possible, but no later than 6 months following preparation of the amendment.


TRAC360 for SPCC provides all of the PE-written and reviewed templates that you need to create your facility-specific required plans, checklists, and training. See how it can solve your top compliance challenges. Find out.


Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.