Tag: PGP

Pesticide General Permit Reissued

The EPA has reissued its Pesticide General Permit (PGP) for point source discharges of pesticides to waters of the United States. Authorized under the Clean Water Act’s National Pollutant Discharge Elimination System (NPDES) program, the PGP was first issued in 2011 and was effective for a 5-year period.

No Changes for Proposed Reissuance of Pesticide General Permit

The EPA is proposing to reissue its hotly debated Pesticide General Permit (PGP) under authority of the CWA Section 402—the National Pollutant Discharge Elimination System (NPDES). The existing 5-year PGP expires midnight, October 31, 2016. According to the Agency, the proposed reissued PGP has the same conditions and requirements as the existing PGP. The proposal […]

What Will Be Happening with Pesticides in 2012

She points out that mandated by a 2009 court decision, EPA’s National Pollutant Discharge Elimination System (NPDES) Pesticide General Permit (PGP) went into effect for point source discharges from pesticide application to U.S. waters. The PGP is believed to be the first permitting requirement of its type many small farmers will face in 2012. State-issued […]